Friday, 1 July 2011

The day has arrived - and so has the Digger!

It's 7:15am, the digger has arrived!
The most stressful part of the operation has started. A 13 tonne excavator, a low loader and an articulated lorry have to arrive, offload the layering and depart before the kids start arriving at school.